| Topic: | Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Closing Weltje Road/Rivercourt Road access | |
| Posted by: | Michael Robinson | |
| Date/Time: | 27/03/23 12:27:00 |
| Bill, Some of the sources I know about are: - DfT annual traffic surveys for locations around GB going back to 2000. On DfT website. - TfL survey cameras on CHR which record counts 24x7. They have been in place since 2021 but some locations have changed because of the construction work. This information is on FOI section of TfL website from multiple FOIs. I think the FOIs have been done by someone opposed to C9 but they will have been disappointed by the results. - Annual TfL cycle count survey on TfL website (goes back to 2015) - Project specific survey data. Peak hour counts were done for all of the junctions on C9 available in the C9 plans. A number of other surveys have been done in the area, data available from Hounslow and Ealing. So basically there isn't one single place where you can get all this information. |