| Topic: | Re:Re:Re:Re:Re:Can we really cope for three years without Hammersmith Bridge? CS9 implications | |
| Posted by: | David Lesniak | |
| Date/Time: | 04/06/19 06:27:00 |
| Have I got it wrong about the bus stops being moved? Bus stops are currently being replaced in situ on both the north and south sides of CHR. An extreme waste of money as many of these stops on the south side are set for either elimination or relocation. |