Topic: | Re:Re:Re:Re:Re:Re:Re:Engineers' view of what the tunnel construction would mean in Chiswick | |
Posted by: | Richard Greenhough | |
Date/Time: | 16/02/15 09:45:00 |
Thomas, it is very easy to sit on the sidelines and sneer at those trying to solve a very difficult problem. I note you didn't disagree with the four options I posted on 11/02/15 at 13:20:00. Do you still think that bringing all the traffic back to ground level is the least-worst option when the present Hammersmith flyover can no longer be patched up ? |