Topic: | Re:Re:Reply | |
Posted by: | David Lesniak | |
Date/Time: | 31/03/22 07:36:00 |
I think the problem has to do with the cycleway construction. Traffic on Chiswick Lane is abominable. It takes 20 minutes to get from Cranbrook Road up to the intersection with the High Road. On a good day. I don't think it will get better upon completion as they have removed the leftmost lane used as either a filter for turning left or a double lane to turn right as was allowed. What I find funny is that after a year, on this same route, they have just re-instated the left filter lane further up on Goldhawk Road. A year ago they remade the roundabout up by the Duchess pub and now they are putting back to what it was. Double the money completely down the drain. And yet removing a filter lane elsewhere on the route is somehow going to succeed??? |