| Topic: | Re:Re:Re:Re:Re:Re:Opening delayed until the new year | |
| Posted by: | Mark Evans | |
| Date/Time: | 20/12/20 09:13:00 |
| Reading between the lines of what TfL have said it looks like they will switch on the lights as soon as they find the missing bit of cable but won't open the cycle lane immediately. This presumably means a cycle phase will be operating on the lights but no cyclists will be allowed to use it. This is clearly an attempt by them to bring cyclists and motorist together because both will be furious. I'd imagine that TfL will be desperate to do this work when Tier 4 lockdown and Christmas is in place. If it still operating this way when the holiday period is over there will be a very negative reaction. |