| Topic: | Re:Accessible Stations | |
| Posted by: | Richard Greenhough | |
| Date/Time: | 20/08/25 10:01:00 |
| The engineering work required to add lifts to the pedestrian overbridge at Chiswick Station would be far less than that required at Turnham Green, where they would have to tunnel through the embankment to reach the island platforms. |