Topic: | Cycleway - another deviation from the plan? | Forum Home |
Posted by: | David Lesniak | |
Date/Time: | 31/03/22 14:27:00 |
Seems the below pics indicated another deviation from the cycleway consultation plan as published. The raised red pavement is the actual crosswalk. So why the four additional depressed curbs (all of which are gray concrete) two on each side of the intersection of Chiswick Lane and the High Road? Also new is the so-called corduroy paving which is also yellow but ribbed not dotted. Seems to me these will be used by cyclists to make the turn to and from Chiswick Lane. So pedal |