| Topic: | Re:Re:Re:Re:Will cyclists obey now? | |
| Posted by: | Chris Blackwell | |
| Date/Time: | 30/10/20 17:06:00 |
| "All the drain covers on the cycleway have been replaced by new ones with a flat surface, level with the tarmac." Difficult to tell with all the leaves. And what about all the standing water? |