| Topic: | Re:Re:Re:Re:Acton Lane shut for a week or longer | |
| Posted by: | Francis Rowe | |
| Date/Time: | 10/10/23 12:10:00 |
| To be fair, both TfL and Hounslow thought that the work was best done during the half term. The alternative of one or both being done outside the holidays was probably considered worse. |