The notifications for the works along Chiswick High Road say that road closures will be necessary on a number of side roads although for how long is not clear. If they are likely to be impactful I don't see how they can proceed with them and they'll need to be cancelled.


Entire Thread
TopicDate PostedPosted By
Trashing Democracy: TfL still say Cycleway 9 is an experiment!17/07/22 18:01:00 Jonathan Mabbutt
   Re:Trashing Democracy: TfL still say Cycleway 9 is an experiment!18/07/22 09:25:00 Peter Evans
      Re:Re:Trashing Democracy: TfL still say Cycleway 9 is an experiment!18/07/22 19:58:00 Philippa Bond
      Re:Re:Trashing Democracy: TfL still say Cycleway 9 is an experiment!18/07/22 20:04:00 Maggie Dodge
      Re:Re:Trashing Democracy: TfL still say Cycleway 9 is an experiment!20/07/22 00:19:00 Jonathan Mabbutt
         Reply20/07/22 04:56:00 John Hall
            Re:Reply22/07/22 09:19:00 Francis Rowe
               Re:Re:Reply22/07/22 17:20:00 David Lesniak
                  Re:Re:Re:Reply22/07/22 23:09:00 Francis Rowe