Forum Message

Topic: Re:Re:Church position on C9?
Posted by: Michael Robinson
Date/Time: 29/09/26 11:11:00

It is a bit strange to oppose the proposed plans. As I can tell, they are the same as those arrived at following discussions with the church about the original 2017 Cycleway 9 plans, and which were endorsed by the church in 2019.

https://tfl.gov.uk/info-for/media/press-releases/2019/january/tfl-moves-forward-with-plans-for-major-new-cycle-route-in-west-london

I will see if I can post the 2019 plans after this, but they show the pavement isn't affected outside the church then the cycle lane curves away from the road to bypass the traffic lights at Heathfield Terrace.

Is there any reason why there has been an apparent change of position? There appears to be minimal changes from the 2019 plans which were developed in discussion with the church then consulted upon.  These would have been built in 2020 if it wasn't for Covid.

Were people not aware of this? Has there perhaps been some misinformation from one of your former Cllr colleagues?


Entire Thread
TopicDate PostedPosted By
“Never trust a Catholic”29/09/26 08:57:00 Peter Thompson
   Church position on C9?29/09/26 09:11:00 Michael Robinson
      Re:Church position on C9?29/09/26 10:52:00 Peter Thompson
         Re:Re:Church position on C9?29/09/26 11:11:00 Michael Robinson
            Re:Re:Re:Church position on C9?29/09/26 11:23:00 Michael Robinson
               Re:Re:Re:Re:Church position on C9?29/09/26 12:33:00 David Lesniak

Forum Home