Forum Message

Topic: Re:Re:Re:Re:Widening M4 elevated section
Posted by: Elizabeth Ross
Date/Time: 27/11/16 10:28:00

Early last year there was a report which showed that when the Thames Barrier first operated, it was raised only a few times each year.  In recent years there were spells when it was raised for almost every tide during the very wet periods.  There was reported that the height of the barrier would have to be increased.........

The proposed tunnelling is a major project at great expense and all dangers must be taken into account.

Perhaps too much forward thinking.


Entire Thread
TopicDate PostedPosted By
Widening M4 elevated section 25/11/16 18:30:00 Elizabeth Ross
   Re:Widening M4 elevated section 25/11/16 18:34:00 Carl Wynne
      Re:Re:Widening M4 elevated section 25/11/16 18:52:00 Julian Pavey
      Re:Re:Widening M4 elevated section 25/11/16 19:03:00 Elizabeth Ross
         Re:Re:Re:Widening M4 elevated section 25/11/16 19:16:00 Claire Moran
            Re:Re:Re:Re:Widening M4 elevated section 25/11/16 20:45:00 Angus McPhail
               Re:Re:Re:Re:Re:Widening M4 elevated section 25/11/16 22:40:00 Bernard Allen
                  Re:Re:Re:Re:Re:Re:Widening M4 elevated section 26/11/16 10:47:00 Andrew OSullivan
                     Re:Re:Re:Re:Re:Re:Re:Widening M4 elevated section 26/11/16 11:24:00 Claire Moran
                        Re:Re:Re:Re:Re:Re:Re:Re:Widening M4 elevated section 26/11/16 13:34:00 Bernard Allen
   Re:Widening M4 elevated section 26/11/16 14:56:00 Tim Brown
      Re:Re:Widening M4 elevated section 26/11/16 15:15:00 Elizabeth Ross
         Re:Re:Re:Widening M4 elevated section 27/11/16 09:24:00 Andrew OSullivan
            Re:Re:Re:Re:Widening M4 elevated section 27/11/16 10:28:00 Elizabeth Ross

Forum Home