Topic: | Re:Re:Re:New traffic tunnel from Chiswick | |
Posted by: | Richard Greenhough | |
Date/Time: | 04/02/16 17:53:00 |
My crystal ball says that if these tunnels were to be constructed, there would certainly be massive congestion during the construction stage. The whole of the A4 and A316 junction at Hogarth Roundabout would have to be remodelled and the only obvious diversion route would be down Chiswick High Road. |