Topic: | Re:Re:Re:Re:Re:Re:Re:Hardwick Road/Essex Road foot bridge works over running | |
Posted by: | Paul Corcoran | |
Date/Time: | 21/06/15 09:06:00 |
It can't be the case that stabilising the embankment in the immediate vicinity would take the best part of a year. It could be that London Underground are using the site as a depot for shipping in and out of materials for use along the whole stretch of the line. If so, the danger is that this becomes a semi-permanent facility. |