Topic: | Re:Re:Hardwick Road/Essex Road foot bridge works over running | |
Posted by: | George Turner | |
Date/Time: | 22/06/15 13:26:00 |
Interesting. The works at night may be minimised to reduce disruption but the works during the day appear to be always running at an extra slow pace. Hence the incredible over run. |