Topic: | Hardwick Road/Essex Road foot bridge works over running | |
Posted by: | George Turner | |
Date/Time: | 27/05/15 13:38:00 |
I assume they need to serve fresh notices etc. Have they already done this, if so when do they expire? Perhaps they would like to treat themselves to another 6 months? The works seem to have been conducted at a very leisurely pace, no real wonder they've over run. |