Forum Message

Topic: Reply
Posted by: Mark Evans
Date/Time: 20/11/26 14:19:00

As discussed here before there are a number of options already for cyclists turning right out of Heathfield Terrace depending on level of confidence. The existing arrangement at the lights is not perfect but not hugely problematic but some cyclists do cut the corner and ride up onto the pavement in front of Exit here. 

That move has now been made legal and this is the way that most cyclists would choose to turn right. The video suggests that as opposed to discouraging it, cyclists are given an indication that this is the correct way to go.

Only a tiny proportion of cyclists are likely to use the complicated hairpin turn by the lights.

This does raise the possibility of increased collisions if vehicles accelerate around the left turn out of Chiswick High Road. The notion that this configuration has 'sorted out' the junction isn't sustainable — there are some aspects that are better some that are worse.





Entire Thread
TopicDate PostedPosted By
Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print19/11/26 20:03:00 Hans Lund-Sorensen
   Reply19/11/26 20:18:00 Paul James
      Re:Reply19/11/26 21:11:00 Simon Hayes
         Re:Re:Reply20/11/26 09:50:00 Tim Garfoot
            Re:Re:Re:Reply20/11/26 11:46:00 Paul James
   Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 10:22:00 Mark Evans
      Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:27:00 David Lesniak
         Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:31:00 Felicity Caborn
            Re:Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:50:00 Paul James
      Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:29:00 Adrian Irving
         Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 12:57:00 Justin Stephenson
            Reply20/11/26 13:49:00 Paul James
               Reply20/11/26 14:19:00 Mark Evans
                  Reply20/11/26 15:47:00 Paul James
                     Re:Reply20/11/26 16:19:00 Peter Evans

Forum Home