Forum Message

Topic: Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print
Posted by: Hans Lund-Sorensen
Date/Time: 19/11/26 20:03:00

Hounslow Council has quietly launched the public consultation on the proposed changes to Chiswick High Road between Duke’s Avenue and Heathfield Terrace (moving C9 onto the southern pavement). It runs until 16 December 2026, with a drop-in session at Chiswick Town Hall on Tuesday 1 December (2:45pm–4:45pm).


You can view the documents and survey on the Let’s Talk Hounslow portal here:

https://talk.hounslow.gov.uk/chiswick-high-road-safety-improvements


Before filling it in, it is well worth opening the Equality Impact Assessment (EqIA) and the illustrated map attached to the page, as they reveal several things not mentioned in the main summary:

• The real reason for the scheme: Both the letter and the EqIA state clearly that moving cyclists onto the pavement is being done to absorb the existing road-level cycle lane and reinstate a westbound left-turn filter lane for motor traffic at Heathfield Terrace.

• Losing over half the pavement (and a 2m pinch point): While the summary claims the remaining pavement will be "at least 3m wide," the council's own EqIA admits the southern footway is currently 7m wide—meaning more than half of it is being lost—and the illustrated map clearly marks a 2m pinch point just west of Bleak House Lane.

• Admitted trip hazards and confusion for blind pedestrians: Page 6 of the EqIA explicitly warns that because the track doesn't run parallel to the kerb or shopfronts, "visually impaired people may become confused," and admits the 50–60mm step between the pavement and cycleway "represents a potential trip hazard."

• Two trees marked for removal: Despite earlier drawings claiming all trees would be retained, the new map shows two mature trees marked with red crosses for removal near Bleak House Lane and Heathfield Terrace.

• Squeezed 2.5m two-way track: The two-way cycle lane has been narrowed to 2.5m—below London Cycling Design Standards for a route carrying 3,500 cyclists a day (including wide cargo bikes and hire bikes), creating conflict for both pedestrians and cyclists.

• No "Support / Oppose" box on the survey: The questionnaire only asks for "comments" on each "improvement" rather than offering a clear Yes/No option—so if you oppose the scheme, make sure you explicitly write "I formally object to this proposal" in the text boxes (especially Questions 4 and 7).

Interested to hear what others make of the EqIA and the new drawings—especially whether anyone spots other issues on the map before we submit formal responses.


Entire Thread
TopicDate PostedPosted By
Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print19/11/26 20:03:00 Hans Lund-Sorensen
   Reply19/11/26 20:18:00 Paul James
      Re:Reply19/11/26 21:11:00 Simon Hayes
         Re:Re:Reply20/11/26 09:50:00 Tim Garfoot
            Re:Re:Re:Reply20/11/26 11:46:00 Paul James
   Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 10:22:00 Mark Evans
      Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:27:00 David Lesniak
         Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:31:00 Felicity Caborn
            Re:Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:50:00 Paul James
      Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 11:29:00 Adrian Irving
         Re:Re:Re:Cycleway 9 pavement reroute consultation is now LIVE (closes 16 Dec) – check the small print20/11/26 12:57:00 Justin Stephenson
            Reply20/11/26 13:49:00 Paul James
               Reply20/11/26 14:19:00 Mark Evans
                  Reply20/11/26 15:47:00 Paul James
                     Re:Reply20/11/26 16:19:00 Peter Evans

Forum Home