Topic: | Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Footbridge near Hardwicke Rd | |
Posted by: | Paul Hughes-Smith | |
Date/Time: | 22/09/15 12:10:00 |
The bridge is now open. Ealing has spent some money resurfacing and relighting the approach to the bridge however nothing has been done to the steps and walkway of the bridge so still no drainage on the landings or refurbishment of the steps or adequate lighting of the steps down. Also noticed the 3 lights that are there seem to be permanently on. All presumably because Ealing does not really have responsibility for the actual bridge and TFL refuses to do anything. The playground area is now not adequately fenced and I caught a 4x4 trying to drive across the green thinking the path was a continuation of Hardwicke Rd. |