We are not going to run out of power barring any major catastrophe.
Generation surplus margin is forecast at a minimum of 8.4GW this winter (with week 42) the tightest.
That means there is 8.4GW more generation capacity that forecast demand. That is not loads but quite a lot given the three nuclear power plants offline only total 2.3GW.

It might be expensive though as some of that 8.4GW is oil fired. But there will be power.


Entire Thread
TopicDate PostedPosted By
Power Cuts this Winter05/09/14 13:40:00 Joy Skinner
   Re:Power Cuts this Winter05/09/14 13:51:00 Rob Reynolds
      Re:Re:Power Cuts this Winter05/09/14 14:29:00 Julian Pavey
      Re:Re:Power Cuts this Winter05/09/14 14:36:00 James Weatherley
         Re:Re:Re: Oh really?05/09/14 15:15:00 Vanessa Smith
   Re:Power Cuts this Winter05/09/14 15:51:00 Susan Kelly
      Re:Re:Power Cuts this Winter05/09/14 16:14:00 Sarah Smith
         Re:Re:Re:Power Cuts this Winter05/09/14 17:01:00 Susan Kelly
   Re:Power Cuts this Winter05/09/14 16:29:00 Richard Greenhough

Forum Home