| Topic: | Re:Re:Re:Water pipe on A316 Bridge Crossing Railway Line… | |
| Posted by: | James Petri | |
| Date/Time: | 08/10/26 09:54:00 |
| Thanks so much Christopher. At least i can see this is on their radar...but very depressing that she, and presumably everyone else at Thames Water, were unaware of the already very long time this leak has gone on for until you alerted them in July. Also depressing is that this leak has been evident for 9-12 months...and that there were 8 months of extensive structural repairs to the bridge in 2023. |