Forum Message

Topic: Re:Re:Building works on Chiswick High Road
Posted by: Andy Pease
Date/Time: 17/04/19 18:02:00

That's correct Loraine.When the Clayton hotel were having their extension built,the noise from the pile driving was horrendous.The construction was going on seven days a week.So I rang the hotel and spoke to the manager explaining that as a local resident the noise from the building work was disturbing us and that no construction was allowed after 1pm on Saturday.And none on Sunday's. The manager apologised for the disruption and from then on there was no construction work carried out at weekends.Make a complaint now and get yourself a peaceful Easter


Entire Thread
TopicDate PostedPosted By
Building works on Chiswick High Road17/04/19 16:51:00 Stephanie Sanders
   Re:Building works on Chiswick High Road17/04/19 17:13:00 Loraine Pemberton
      Re:Re:Building works on Chiswick High Road17/04/19 18:02:00 Andy Pease

Forum Home