Topic: | Business Park Bridge | |
Posted by: | Adam Bradley | |
Date/Time: | 07/01/14 12:05:00 |
When did you notice the levelling of the footings? I recently noticed an A4 sign at the rear of the business park saying that the bridge is now going up. Perhaps they've changed the design or moved things slightly? I thought that the bridge was a planning requirement for the construction/use of building 7 - if so then that's a very strong incentive for them to build it. |