Topic: | Re:Re:OJEU notice | |
Posted by: | Patrick ONeill | |
Date/Time: | 06/01/14 11:30:00 |
In my experience with engineering projects (admittedly not with railway signalling), there is a general principle of "you can have it cheap, quick or well done, but only two out of those three..." Does it look like TfL went with the "cheap" and "quick" option with Bombardier...? |