Topic: | Re:Re:Re:Tube running at 90% of 2019 levels in 2022? | |
Posted by: | Julian Pavey | |
Date/Time: | 12/06/21 10:45:00 |
Low levels long-term will result in a large network being reduced in service or closed in parts or you will pay a lot more for traveling. And that will include tube and bus The network needs pre-lockdown numbers and even more on top of past levels to keep it operational and where needed upgraded and not downgraded or scrapped Also means loss of jobs, it is a big network |