Topic: | Roadworks in Acton causing bus diversions (including E3) and traffic delays | |
Posted by: | Patrick Green | |
Date/Time: | 22/10/15 13:26:00 |
Full details below starting with the E3, N11 and 440 Contractors on behalf of Thames Water will be carrying out emergency repairs to a collapsed sewer on High Street, Acton. This will result in the full closure of High Street, Acton between the roundabout at Steyne Road and Gunnersbury Lane. Buses will be diverted as follows: Route E3 & N11 Towards Greenford and Ealing Broadway From Acton Lane at the junction with Bollo Bridge Road, diverted left Bollo Bridge Road, right Bollo Lane, left Gunnersbury Lane to normal line of route Towards Chiswick & Liverpool Street From Gunnersbury Lane at the junction with Bollo Lane, diverted right Bollo Lane, left Bollo Bridge Road, right Acton Lane to normal line of route Route 440 towards Power Road: From Noel Road at the junction with Lynton Road, diverted left Lynton Road, right Horn Lane, ahead Steyne Road, left High Street, Acton to normal line of route Towards Stonebridge Park. From High Street, Acton at the roundabout at Steyne Road, diverted right Steyne Road, ahead Horn Lane, left Lynton Road, right Noel Road to normal line of route. Routes 207, 607 , N7, N207. Towards Ealing Broadway: From High Street, Acton at the roundabout at Steyne Road, diverted right Steyne Road, ahead Horn Lane, left Noel Road, ahead Twyford Avenue, right Uxbridge Road to normal line of route. Towards Acton: From Uxbridge Road at the junction with Twyford Avenue, diverted left Twyford Avenue, ahead Noel Road, right Horn Lane, ahead Steyne Road, left High Street, Acton to normal line of route. Route 427 Towards Acton Town Hall Will be required to curtail to Ealing Broadway, Haven Green and stand at the 'Horseshoe' stand opposite the shops - Previously the route 65 Stand Towards Uxbridge From the stand on Haven Green, diverted ahead Haven Green, right The Broadway to normal line of route. |
Topic | Date Posted | Posted By |
Roadworks in Acton causing bus diversions (including E3) and traffic delays | 22/10/15 09:51:00 | Patrick Green |
Re:Roadworks in Acton causing bus diversions (including E3) and traffic delays | 22/10/15 12:07:00 | Andrew OSullivan |
Roadworks in Acton causing bus diversions (including E3) and traffic delays | 22/10/15 13:26:00 | Patrick Green |